Safe Sidewalk LA Public Meeting

Loading Events

Draft EIR for the Sidewalk Repair Program

The Draft Environmental Impact Report (Draft EIR) for the Sidewalk Repair Program is now available for public review and comment. Hard copies of the Draft EIR and technical studies are available for review at these locations. The electronic copies are available to download here.

Comments can be made during the 60-day Public Review Period lasting from Thursday, December 26, 2019 to Monday, February 24, 2020.

Ways to Provide Comments on the Draft EIR:

Shilpa Gupta, Environmental Supervisor I
Los Angeles Bureau of Engineering
Environmental Management Group
1149 S. Broadway, Suite 600, Mail Stop 939
Los Angeles, CA 90015

https://sidewalks.lacity.org/environmental-impact-report

Share This Story, Choose Your Platform!

Go to Top